Buying guide

Flat Handover Checklist: How to Take Possession of a New Flat

What to check before the possession date, the documents to collect at handover, a room-by-room snag list, the meter readings to note, and what RERA says about fixing defects afterwards.

By Shriya PropertiesUpdated 26 November 20266 min read

Handover day is when years of payments turn into keys. It is also the last moment when you have the builder's full attention, so it pays to arrive prepared. This checklist is for a family taking possession of a new flat in Hubballi (Hubli) or Dharwad, whether you live in the city or are flying in from Bengaluru, Mumbai or abroad for the day.

Work through it in three parts: what to settle before the possession date, what to inspect and collect on the day, and what to do about the defects you will almost certainly find.

Before the possession date

Check the occupancy certificate. The builder must obtain the completion or occupancy certificate and make it available to you (RERA section 11(4)(b)), and the Supreme Court directed in December 2024 that builders hand over possession only after obtaining it (The Tribune, 1 January 2025). Ask for a copy before you pay the last instalment; our occupancy certificate guide explains what to look for.

Note your two-month window. Once the OC is issued, you must take physical possession within two months (section 19(10) of the RERA Act). Until the builder hands over possession, it must pay the outgoings it has collected from buyers, such as taxes and utility charges (section 11(4)(g)).

Check the final statement. Ask for a written account of everything paid and still due, and match it against your agreement for sale. A typical final demand looks like this for a hypothetical ₹70 lakh flat:

Item Amount
Last instalment (10% of ₹70 lakh) ₹7,00,000
GST at 5%, if charged on this instalment ₹35,000
Advance maintenance, 12 months at ₹3 per sq.ft on 1,300 sq.ft (assumed) ₹46,800
Corpus fund (assumed) ₹50,000
Due to the builder ₹8,31,800
Stamp duty and registration at 7.6%, paid to the state ₹5,32,000

The maintenance and corpus figures are assumptions for the example; your agreement will set the real ones. Stamp duty is charged on the higher of the price and the guidance value; see our stamp duty guide. Whether GST applies to the last instalment depends on when the completion certificate was issued and how much you had paid before it.

Register the sale deed. Possession and the registered sale deed usually go together. Where no local law sets a period, the builder must register the conveyance deed within three months of the OC (section 17(1)). If you have a home loan, the bank will keep the original registered deed.

Documents to collect at handover

Document Why you need it
Copy of the occupancy and completion certificates Proof the building may be occupied; needed for utilities, loans and resale
Registered sale deed Your title; the bank keeps the original if you have a loan
Possession letter, dated and signed Starts the five-year defect liability period
Parking allotment letter Shows which slot is yours and on what basis
Final receipts and a no-dues letter Proof you have paid in full
Electrical and plumbing layout of your flat Tells you where the wires and pipes run before you drill
Warranty cards and invoices for fittings Water heater, pump, sanitaryware, door locks, any appliances
Electricity and water connection details Consumer numbers, meter numbers and deposit receipts
Key list Every key handed over, including letterbox and utility rooms
Maintenance terms and receipts What you pay, to whom, from which date

Ask also for the property tax position. After registration you will transfer the khata into your name with HDMC; see khata transfer after purchase.

Snag list, room by room

A snag is any defect or unfinished item. Inspect in daylight, take two hours, and bring a torch, a measuring tape, a spirit level, a socket tester, a marble or small ball, a bucket and masking tape to mark each snag.

Main door and windows

  • Doors open and close without scraping; locks and peepholes work.
  • Window sliders run smoothly; rubber seals are fitted; no gaps when closed.
  • Glass is free of cracks and scratches.

Walls and ceilings

  • No cracks, damp patches or bubbling paint, especially below windows and near bathrooms.
  • Corners are straight; paint is even.

Floors and tiles

  • Tap every tile with a coin: a hollow sound means it may come loose.
  • Joints are filled; no chipped or uneven tiles. Check the skirting.

Kitchen

  • Platform is level; sink drains quickly; no leaks under it.
  • Points are provided for the chimney, water purifier, refrigerator and other appliances as in the specification.

Bathrooms

  • Pour a bucket of water: it should run to the drain and not pool.
  • Taps, shower and flush work; hot water runs; no leaks at the joints.
  • Check the ceiling of the bathroom below if you can, for seepage.

Electrical

  • Every switch and socket works; test sockets with the tester.
  • The distribution board has labelled circuits and an earth-leakage breaker.
  • Count the points against the specification in your agreement.

Balconies and utility area

  • The floor slopes to the drain; railings are firm and of safe height.

Common areas

  • Lifts work and carry a current certificate; staircases are lit; fire equipment is in place; your parking slot is marked.

Photograph each snag with masking-tape labels, list them room by room, and have the builder's representative sign and date the list.

Meter readings and first bills

Note the electricity and water meter readings on handover day, photograph them with the date visible, and attach them to the snag list. This stops you paying for power and water used during finishing work. Then ask how the electricity connection will be transferred to your name with HESCOM, and keep the deposit receipts.

What to do about defects

Under RERA section 14(3), if you report any structural defect, or any defect in workmanship, quality or services, within five years of handover, the builder must fix it free of charge within 30 days. If it does not, you are entitled to compensation (RERA Act text).

  1. Send the signed snag list by email as well as on paper, so there is a dated record.
  2. Agree a date for the fixes, and inspect again when they are done.
  3. Report anything that appears later in writing, with photos, as soon as you notice it.
  4. If the builder does not act, you can complain to Karnataka RERA; see filing a RERA complaint.

Minor snags are normal in a new flat and are best fixed after you take possession, within the defect liability period, rather than by refusing the keys. Serious problems are different: no OC, a flat that does not match the sanctioned plan, or a carpet area well short of the agreement. Take legal advice on those before you accept possession. Our guide to defect liability under RERA covers the details.

Common areas and the association

After the OC, the builder must also hand the documents and plans of the common areas to the residents' association, within 30 days where no local law applies (section 17(2)). Karnataka's 2026 apartment law, once in force, will require title documents, as-built drawings, fire and lift approvals, warranties, maintenance contracts and the corpus fund to be handed to the association within 60 days of the OC (Karnataka Act No. 45 of 2026, section 16). See apartment owners' associations.

Sources

  1. Real Estate (Regulation and Development) Act, 2016 — Act text — Haryana Real Estate Regulatory Authority, accessed 26 November 2026
  2. No loans, electricity, water and sewerage connections for buildings without completion/occupation certificate, orders SC — The Tribune, accessed 26 November 2026
  3. The Karnataka Apartment (Ownership and Management) Act, 2026 (Karnataka Act No. 45 of 2026) — Government of Karnataka (via PRS Legislative Research), accessed 26 November 2026
  4. Property registration fee increased from 1% to 2% of overall value — Star of Mysore, accessed 26 November 2026

Written by the Shriya Properties team in Hubballi and checked against the sources above on 26 November 2026. Rules, rates and prices change — confirm the current figures before you decide. Spotted something out of date? Tell us.

Questions buyers ask

What documents should I collect when taking possession of a flat?

A copy of the occupancy and completion certificates, the registered sale deed, a dated possession letter, the parking allotment, final receipts and a no-dues letter, the electrical and plumbing layout, warranty cards, utility connection details and a list of keys.

What is a snag list?

A written, room-by-room list of defects and unfinished work in a new flat, with photos, signed and dated by you and the builder’s representative at handover.

How long does a builder have to fix defects after possession?

Under RERA section 14(3), defects reported within five years of handover must be fixed free of charge within 30 days. If not, the buyer is entitled to compensation.

Can I refuse possession because of defects?

Minor snags are better recorded and fixed under the five-year defect liability. Refusing possession is a serious step, and RERA expects you to take possession within two months of the OC, so take legal advice for major issues.

Should I take possession of a flat without an occupancy certificate?

No. The OC is the permission to occupy, and since the Supreme Court’s December 2024 ruling builders are expected to hand over possession only after obtaining it.